477 Contemporary - 9,500 Lumen - Fixture/Pole $23.09 $27.71
497 Contemporary- 9,500 Lumen -2nd Fixture$17.00 $17.00
478 Contemporary- 22,000 Lumen - Fixture/Pole* $29.73 $35.68
498 Contemporary- 22,000 Lumen - 2nd Fixture* $19.84 $19.84
479 Contemporary- 50,000 Lumen - Fixture/Pole* $36.74 $42.55
499 Contemporary-50,000 Lumen- 2nd Fixture* $24.15 $24.15
300 Dark Sky - 4,000 Lumen $24.72 $26.46
301 Dark Sky - 9,500 Lumen $25.83 $28.18
Metal Halide
490 Contemporary - 12,000 Lumen - Fixture Only $17.45 Move to
494 Contemporary - 12,000 Lumen - Smooth Pole $31.42 Move to
491 Contemporary - 32,000 Lumen - Fixture Only $24.68 $24.68
495 Contemporary - 32,000 Lumen - Smooth Pole $38.64 $41.06
493 Contemporary - 107,800 Lumen - Fixture Only $51.32 Move to
496 Contemporary - 107,800 Lumen - Smooth Pole $65.28 Move to
Light Emitting Diode (LED)
396 Cobra Head - 8,179 Lumen - Fixture/Pole N/A $36.27
397 Cobra Head - 14,166 Lumen - Fixture/Pole* N/A $39.47
398 Cobra Head - 23,214 Lumen - Fixture/pole* N/A $49.15
399 Colonial, 4Sided - 5,665 Lumen - Fixture/Pole N/A $38.32
RLS
RLS
RLS
RLS
Restricted Liqhtina Service - Rate RLS
Availability of Service:
Current
Service under this rate schedule is restricted to those lighting fixtures/poles in service as of January 1,
2013, except where a spot replacement maintains the continuity of multiple fixtures/poles comprising a
neighborhood lighting system or continuity is desired for a subdivision being developed in phases. Spot
placement of restricted fixtures~poles is contingent on the restricted fixtures/poles being available from
manufacturers. Spot replacement of restricted units will be made under the terms and conditions provided
for under non-restricted Lighting Service Rate LS.
In the event restricted fixtures/poles fail and replacements are unavailable, Customer will be given the
choice of having Company remove the failed fixture/pole or replacing the failed fixture/pole with other
available fixture/pole.
P
Service under this rate schedule is restricted to those lighting fixtures/poles in service as of January 1,
2013, except where a spot replacement maintains the continuity of multiple fixtures~poles composing a
neighborhood lighting system or continuity is desired for a subdivision being developed in phases. Spot
placement of restricted fixtures/poles is contingent on the restricted fixtures/poles being available from
manufacturers. Spot replacement of restricted units will be made under the terms and conditions pro-
vided for under non-restated Lighting Service Rate LS. Spot replacements will not be available for
Mercury Vapor and Incandescent rate codes.
In the event restricted fixtures/poles fail and replacements are unavailable, Customer will be given the
choice of having Company remove the failed fixture~pole or replacing the failed fixture/pole with other
available fixture/pole.
Units marked with an asterisk (*) are not available for use in residential neighborhoods except by munici-
pal authorities.
OVERHEAD SERVICE
High Pressure Sodium
461 Cobra Head - 4,000 Lumen - Fixture Only $ 8.53
471 Cobra Head - 4,000 Lumen - Fixture & Pole $11.73
409 Cobra Head- 50,000 Lumen - Fixture Only* $13.56
426 Open Bottom - 5,800 Lumen - Fixture Only $ 8.54
Metal Halide
450 Directional - 12,000 Lumen - Fixture Only
454 Directional - 12,000 Lumen - Flood Fixture & Pole
455 Directional - 32,000 Lumen - Flood Fixture & Pole*
452 Directional - 107,800 Lumen - Fixture Only*
459 Directional- 107,800 Lumen - Flood Fixture & Pole*
Mercury Vapor
446 Cobra Head - 7,000 Lumen - Fixture Only $10.77
456 Cobra Head - 7,030 Lumen - Fixture & Pole $13.27
447 Cobra Head - 10,000 Lumen - Fixture Only $12.77
457 Cobra Head - 10,000 Lumen - Fixture & Pole $1,~.98
448 Cobra Head -20,030 Lumen - Fixture Only $14.45
458 Cobra Head -20,000 Lumen -Fixture & Pole $16.91
404 Open Bottom - 7,000 Lumen - Fixture Only $11.87
Incandescent
421 Tear Drop - 1,000 Lumen - Fixture Only$ 3.81
422 Tear Drop - 2,500 Lumen - Fixture Only$ 5.11
424 Tear Drop - 4,000 Lumen - Fixture Only$ 7.63
434 T, ear.Drop - 4,030 Lumen - Fixture & Pole $ 8.67
425 Tear Drop - 6,000 Lumen - Fixture Only$10.19
Rate Per Liaht Per Month
Current Pr_mp__q,_s
$10.07
$14.08
$16.27
$ 8.54
Movedfrom LS
$2O.89
$27.56
Movedfrom LS
$52.45
$16.13
$20.89
$27.56
$47.70
$52.45
$11.09
$14.01
$13.49
$15.82
$14.88
$17.86
$11.87
$ 3.81
$ 5.11
$ 7.63
Eliminated
$10.19
Rate Per Llaht Per Month
UNDERGROUND SERVICE Current r~
Metal Halide
460 Direct - 12,000 Lumen - Flood Fixture & Pole $30.10 $35.23
469 Direct - 32,030 Lumen - Flood Fixture & Pole* $36,77 $39.76
470 Direct - 107,800 Lumen - Flood Fixture & Pole* $61.66 $61.66
490 Contemporary - 12,030 Lumen - Fixture Only Moved from LS $17.45
494 Contemporary - 12,030 Lumen - Smooth Pole Moved from LS $31.42
493 Contemporary - 107,800 Lumen - Fixture Only* Moved from LS $51.32
496 Contemporary - 107,800 Lumen - Smooth Pole* Moved from LS $65.28
High Pressure Sodium
440Acorn - 4,030 Lumen- Flood Fixture & Pole $15.11 $18.13
410 Acorn - 4,000 Lumen - Fluted Pole $22.31 $26.77
466 Colonial - 4,030 Lumen - Smooth Pole $10.79 $12.95
412Coach - 5,800 Lumen-Smooth Pole $33.87 $36.70
413 Coach - 9,500 Lumen - Smooth Pole $34.19 $37.46
Cur_rent Pr_9.~
360 Granville Pole and Fixture, 16000L $62.30 $62.30
Energy Charge per kWh:
Liqhtina Eneray Service - Rate LE
current
$0.07328 $0.07328
Traffic Eneroy Service - Rate TE
Current
Basic Service Charge per Month: $4.00 per delivery
Energy Charge per kWh: $0.08740
Pr_~posed
Basic Service Charge per Month: $4.00 per delivery point
Energy Charge per kWh: $0.09289
Availability of Service
_Current
Available to municipalities, county governments, divisions of the state or Federal govemments or any
other governmental agency for service on a 24-hour all-day every-day basis, where the governmental
agency owns and maintains all equipment on its side of the point of delivery of the energy supplied
hereunder. In the application of this rate each point of delivery will be considered as a separate customer.
This service is limited to traffic control devices including, signals, cameras, or other traffic lights and
electronic communication devices.
Pr_r_o_posed
Available to municipalities, county governments, divisions of the state or Federal governments or any
other governmental agency for service on a 24 hour all day every day basis, where the govemmantal
agency owns and maintains all equipment on its side of the point of delivery of the energy supplied
hereunder. In the application of this rate each point of delivery will be considered as a separate customer.
This service is limited to traffic control devices including, but not limited to, signals, cameras, or other
traffic lights, electronic communication devices, and emergency sirens.
Cable Television Attachment Char aes - Rate CTAC
Current
Attachment Charge per year
for each attachment to pole: $7.25
Rate schedule to be renamed Pole and Structure Attachment Charges Rate PSA.
Pole and Structure Attachment Charoes - Rate PSA
Company proposes numerous revisions to the terms and conditions of service in this schedule. These
revisions include the expansion of the applicability of the rates, terms and conditions to all telecommuni-
cation carriers except: (1) facilities of incumbent local exchange carriers with joint use agreements with
the Company; (2) facilities subject to a fiber exchange agreement; and (3) Macro Cell Facilities. Com-
pany further proposes any telecommunication carder who is currently permitted to make attachments to
Company facilities under an existing license agreement will' be required to comply with the terms of the
revised Schedule PSA upon the expiration of the current term of its license agreement with KU. In
addition, Company proposes other changes in the terms and conditions, including, but not limited to
attachment charges for each linear foot of duct and Wireless Facility, to the imposition of a late payment
fee of three percent if the attachment customer fails to pay its bill within 60 days of the bill's issuance, that
attachment customers become members in the National Joint Utilities Notification System, a detailed
listing of the conditions and procedures to obtain permission to attach facilities to Company structures
and to maintain and operate those attachments on KU structures and the conditions under which wireless
facilities may be attached to Company structures. Customers who may take service under this schedule
or under a under a license agreement with Company for the attachment to Company facilities or c[esire to
make such attachments to Company's poles or other structures or within Company's ducts may review
the proposed revisions at Company's website or other locations identified below in this notice.
Attachment Charges
$ 7.25 per year for each w/reline pole attachment.
$ 0.81 per year for each linear foot of duct.
$84.00 per year for each Wireless Facility.
Electric Vehicle Supply Eaulpment - EVSE
Current Pm sed
Monthly Charging Unit:
Single Charger $180.83 $185.28
Dual Charger $302.41 $311.03
Electric Vehicle Charaino - EVC
currant
Fee Per Hour $2.88 $2.90
Curtailable Service Rider -CSR
Prima__~ Current P rgizlZ=~_
Monthly Demand Credit Per kVA: $ 6.50 $ 3.31
Non-Compliance Charge Per kVA: $16.00 $16.00
Transmission Current Pr_r_OJ~;6~!
Monthly Demand Credit Per kVA: $ 6.40 $ 3.20
Non-Compliance Charge Per kVA: $16.00 $16.00
Availability of Service
_Current
This rider shall be made available to customers served under applicable power schedules who contract
for not less than 1,000 kVA individually. The aggregate service under CSR for Kentucky Utilities Company
is limited to 100 MVA in addition to the contracted curtailable load under P.S.C. No. 7, CSR1 for Kentucky
Utilities Company as of August 1, 2010.
Pr__m_posed
This rider shall be limited to customers served under applicable power schedules who contract for not
less than 1,030 kVA individually, and executed a contract under this rider prior to January 1, 2017. Com-
pany will not enter into contracts for additional curtallable demand, even with customers already partici-
pating in this rider, on or after January 1, 2017.
Contract Option
Current
Customer may, at Customer's option, contract with Company to curtail service upon notification by Com-
pany. Requests for curtailment shall not exceed three hundred and seventy-five (375) hours per year nor
shall any single request for curtailment be for less than thirty (30) minutes or for more than fourteen (14)
hours per calendar day, with no more than two (2) requests for curtailment per calendar day within these
parameters. A curtailment is a continuous event with a start and stop time. Company may request or
cancel a curtailment at any time during any hour of the year, but shall give no less than sixty (60) minutes
notice when either requesting or canceling a curtailment.
Company may request at its sole discretion up to 100 hours of physical curtailment per year. Company
will request physical curtailment only when (1) all available units have been dispatched or are being
dispatched and (2) all off-system sales have been or are being curtailed. Company may also request at
its sole discretion up to 275 hours of curtailment per year with a buy-through option, whereby Customer
may, at its option, choose either to curtail service in accordance with this Rider or to continue to purchase
its curtailable requirements by paying the Automatic Buy-Through Price, as set forth below, for all kilowatt
hours of curtallable requirements.
Customer may, at Customer's option, contract with Company to curtail service upon notification by Com-
pany. Requests for curtailment shall not exceed three hundred and seventy-five (375) hours per year nor
shall any single request for curtailment be for less than thirty (30) minutes or for more than fourteen (14)
hours per calendar day, with no more than two (2) requests for curtailment per calendar day within these
parameters. A curtailment is a continuous event with a start and stop time. Company may request or
cancel a curtailment at any time during any hour of the year, but shall give no less than sixty (601 minutes
notice when either requesting or canceling a curtailment.
Company may request at its sole discretion up to 100 hours of physical curtailment per year. Company
will request physical curtailment only when (1) all available units have been dispatched or are being
dispatched and (2) all off-system sales have been or are being curtailed. Company may also request at
its sole discretion up to 275 hours of curtailment per year with a buy-through option, whereby Customer
may, at its option, choose either to curtail service in accordance with this Rider or to continue to purchase
its curtailable requirements by paying the Automatic Buy-Through Price, as set forth below, for all kilowatt
hours of curtallable requirements. Customer's choosing to curtail rather than buy through during any of
the 275 hours of Company-requested curtailment with a buy-through option each year shall not reduce,
diminish, or detract from the 100 hours of physical curtailment Company may request each year.
Automatic Buy-Through Price
Current
The Automatic Buy-Through Price per kWh shall be determined daily in accordance with the following
formula:
Automatic Buy-Through Price = NGP x .012000 MMBtu/kWh
Where: NGP represents the mid-point price for natural gas ($/MMBtu) posted for the day in Platts Gas
Daily for Dominion- South Point and will be used for the electrical day from 12 midnight to midnight. Also
the posted price for Monday or the day after a holiday is the posted price for Saturday, Sunday and the
holiday.
P r__op__q,s
The Automatic Buy-Through Price per kWh shall be determined daily in accordance with the following
formula:
Automatic Buy-Through Price = NGP x .012000 MMBtu/kWh
Where: NGP is the Cash Price for "Natural Gas, Henry Hub" as posted in The Wall Street Journal on-line
for the most recent day for which a price is posted that precedes the day in which the buy-through oc-
curred.
Standard Rider for Excess Fecilitles- Rider EF
Customer shall pay for excess facilities by: Current Pr_.r_~
(a) Making a monthly Excess Facilities charge payment
equal to the installed cost of the excess facilities times
the following percentage:
Percentage with No Contribution-in-Aid-of-Construction 1.24% 1.24%
(b) Making a one-time Contribution-in-Aid-of-Construction
equal to the installed cost of the excess facilities plus a
monthly Excess Facilities Charge payment equal to the
installed cost of the excess facilities times the following
percentage:
Percentage with Contribution-in-Aid-of-Construction 0.48% 0.48%
Standard Rider for Redundant Caoecity Charae - Rider RC
Current P_r_mz z !
Capacity Reservation Charge per Month: (Per kW/kVA) (Per kW/kVA)
Secondary Distribution $1.12 $1.09
Primary Distribution $1.11 $0.90
Economic Development Rider- Rider EDR
Company proposes the following changes to Rider EDR's Terms and Conditions:
Current
c)2)i.) Company and the existing customer will determine Customer's Existing Base Load by averagirjg
Customer's previous three years' monthly billing loads, subject to any mutually agreed upon adjustments
theret~
Proj sed
c)2)i.) Company and the existing customer will determine Customer's Existing Base Load by calculating
a 12-month rolling average of measured demand.
Standard Rider for SuDolemental
Contract Demand per month:
Secondary
Primary
Transmission
Pr_r_o_. m
Company proposes to eliminate this Rider.
or Standby Service - Rider SS
Cur nt
(Per kW/kVA)
$12.84
$11.63
$1o.58
Electric
Monthly Charging Unit Fee
Single Charger
Dual Charger
Vehicle
Supply Eaulpment - Rider EVSE-R
Current
$132.68
$206.11
$133.18
$206.81
Current Rate $10.00
ProDoeed Rate $10.03
Returned Payment Charae
Current Rate $75.03
ProDosed Rate $75.00
Meter Test Char ae
Current Rate
Proposed Rate
Disconnectina and ReconnectlnqServiceCharae
$28.00
$28.00
Current Rate
$15.00 per month per installed set of
Proposed Rate
$15.00 per month per installed set of
Meter Pulse Chame
pulse-generating equipment
pulse-generating equipment
Meter Data Proceesin_a Charae
Current Rate $2.75 per report
Company proposes to eliminate this charge.
Continued next page